Pipeline

Pipeline Construction and Tie-ins

Construction of new pipeline sections with multiple tie-ins into live production infrastructure, including pre-commissioning, hydro testing and commissioning support within a constrained production window.

Client

Niger Delta Exploration & Production Plc.

Location

Bayelsa State, Nigeria

Duration

9 months

Completion

2023

Scope of work

  • Pipeline construction
  • Tie-ins and pre-commissioning
  • Hydro testing and commissioning
  • Weld inspection and NDT
  • Reinstatement and site restoration

Challenges

  • Swamp terrain with limited access and seasonal flooding
  • Tie-ins required into live production facilities
  • Narrow shutdown window agreed with the operator

Our solutions

  • Detailed logistics planning with barge and swamp buggy support
  • Pre-fabrication of spools off-site to reduce field welding time
  • 24-hour supervised execution during the shutdown window with permit control

Results

  • Tie-ins completed within the agreed production window
  • Zero lost-time incidents recorded across the campaign
  • All welds accepted with no significant rework
Pipeline Construction and Tie-ins site photographPipeline Construction and Tie-ins site photographPipeline Construction and Tie-ins site photograph

Ready to discuss your next project?

Talk to our engineering team about scope, schedule and cost. We respond to every enquiry within one business day.