Fabrication
Storage Tank Fabrication & Installation
Fabrication, installation, alignment and testing of storage tanks, delivered from our Port Harcourt fabrication capability through to site commissioning.
Client
Aiteo Eastern E&P Company Limited
Location
Rivers State, Nigeria
Duration
6 months
Completion
2022
Scope of work
- Tank fabrication
- Installation and alignment
- Welding and NDT
- Coating and painting
- Testing and commissioning
Challenges
- Tight dimensional tolerances on shell and floor plates
- Coordination of heavy lifts on a congested site
- Weather disruption during the rainy season
Our solutions
- Controlled shop fabrication with staged dimensional inspection
- Detailed lift plans and certified rigging supervision
- Schedule buffers and covered work areas to protect coating quality
Results
- Tanks installed with no dimensional rework required
- Hydro testing passed at first attempt
- Delivered within the agreed programme